EXACTLY HOW TO INSTALL A TUB (STEP BY STEP).

Exactly how to Install a Tub (Step By Step).

Exactly how to Install a Tub (Step By Step).

Blog Article

Schedule Your Service

What are your concepts about How to Install a Bathtub?


A Step-by-Step Guide to Installing a Bathtub
Mounting a bath tub isn't precisely rocket science, but it does require strong plumbing, woodworking, as well as in some cases, tiling skills. Changing an old bath tub with a brand-new one is likewise a moderately hard task. If the old tub is readily accessible, the task can relocate rapidly; if you have to open up a wall surface to eliminate the old tub and also place the new bath tub, the job is much harder. In either case, the task is within a house handyman's skills, although you will require a helper to move out the old bathtub as well as set in the brand-new one. Ensure you have actually certified yourself for the work as well as are comfortable trying it. Instead of hiring a service provider to take over a halfway-completed project, it is far better to think about employing one prior to you begin. Opportunities are you may require an expert plumber to make tube links.
This post will help you set up a new bath tub in your washroom if you have actually already acquired a new tub and also do not need to transform the plan of your previous supply of water pipelines.
Your tools and also product checklist must comprise the following:
  • New Bath tub

  • Hammer

  • Pipe Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Adjustable Wrench

  • Putty Blade

  • Screwdriver

  • Cold Chisel

  • Measuring tape

  • Pipe Caps


  • Removing Old Touches


    If you need to change old taps with new ones as a part of your installment, then the first thing you need to do is detach the water. After doing so, switch on the faucets to drain pipes any type of water continuing to be in the system. The process of eliminating the existing faucets can be quite troublesome due to the restricted accessibility that is typically the instance.
    Use a container wrench (crowsfoot spanner) or a faucet device to undo the nut that links the supply pipelines to the taps. Have a fabric all set for the staying water that will certainly come from the pipes. When the supply pipelines have been eliminated, make use of the same tool to loosen the nut that holds the faucets onto the bath/basin. You will certainly require to stop the single taps from turning throughout this procedure. As soon as the taps have been eliminated, the holes in the bath/basin will certainly need to be cleaned of any type of old securing compound.
    Before carrying on to fit the brand-new taps, compare the pipeline links on the old taps to the new taps. If the old faucets are longer than the brand-new faucets, then a shank adapter is required for the brand-new faucets to fit.

    Suitable New Taps


    If the tails of the new taps are plastic, after that you will certainly require a plastic connector to avoid damages to the string. One end of the adapter fits on the plastic tail of the tap and the other end supplies a link to the current supply pipes.
    If you need to fit a monobloc, then you will need lowering couplers, which attaches the 10mm pipeline of the monobloc to the standard 15mm supply pipe.
    Next, position the tap in the installing opening in the bath/basin making certain that the washing machines remain in area in between the tap and the sink. Secure the tap in place with the producer provided backnut. Once the tap is firmly in place, the supply pipes can be connected to the tails of the taps. The taps can either be attached by utilizing corrugated copper piping or with regular faucet ports. The former type should be linked to the tap ends first, tightening only by hand. The supply pipes can later be connected to the other end. Tighten both ends with a spanner after both ends have actually been attached.

    Mounting the Bath tub


    Making use of both wood boards under its feet, put the tub in the needed setting. The wooden boards are useful in evenly spreading the weight of the bath tub over the location of the boards as opposed to concentrating all the weight onto four little points.
    The next objective is to make certain that the tub is leveled all round. This can be accomplished by inspecting the spirit level and readjusting the feet on the bath tub up until the spirit level reads level.
    To mount faucets, fit the bottom of the furthest flexible faucet port to the suitable supply pipe by making a compression join; after that do the exact same for the other tap.
    Activate the water system as well as check all joints and also new pipework for leaks and also tighten them if essential. Fill up the tub as well as additionally inspect the overflow outlet and also the typical outlet for leakages.
    Ultimately, deal with the bathroom paneling as described in the supplier's user's manual. Tiling and also securing around the bathtub needs to wait up until the bathtub has actually been utilized at least when as this will resolve it right into its final placement.

    Getting ready for the Setup


    Firstly, the supporting structure provided with the bath should be fitted (if called for) according to the producer's instructions. Next off, fit the taps or mixer to the bath tub. When fitting the faucet block, it is very important to ensure that if the faucet includes a plastic washer, it is fitted in between the bath and also the taps. On a plastic bathroom, it is also reasonable to fit a supporting plate under the faucets unit to avoid strain on the tub.
    Fit the flexible tap adapters to the bottom of the two faucets utilizing 2 nuts and olives (often supplied with the bathtub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink outlet opening, and then pass the outlet via the hole in the bath. Utilize the nut supplied by the producer to fit the plug-hole. Check out the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next, fit the end of the adaptable overflow pipe to the overflow outlet. Afterwards, screw the pipeline to the overflow face which should be fitted inside the bathroom. See to it you use all of the provided washers.
    Link the catch to the bottom of the waste electrical outlet on the bathtub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, and screw on the trap to the electrical outlet. Link all-time low of the overflow tube in a similar manner.The bath need to currently be ready to be fitted in its last placement.

    Tiling Around the Bathtub


    In the area where the bath satisfies the floor tile, it is essential to seal the joins with a silicone rubber caulking. This is very important as the installation can move enough to break a stiff seal, creating the water to pass through the wall between the bath as well as the tiling, causing difficulties with wetness and possible leaks to the ceiling below.
    You can pick from a selection of coloured sealants to blend in your fixtures as well as installations. They are marketed in tubes and cartridges, and are capable of sealing spaces approximately a size of 3mm (1/8 inch). If you have a larger gap to fill, you can fill it with twists of drenched paper or soft rope. Bear in mind to constantly load the bath tub with water prior to securing, to permit the movement experienced when the tub is in usage. The sealer can fracture rather very early if you do not take into account this movement before sealing.
    Alternatively, ceramic coving or quadrant tiles can be used to border the bathroom or shower tray. Plastic strips of coving, which are easy to use and also reduce to dimension, are additionally quickly offered on the market. It is recommended to fit the tiles using waterproof or water-proof glue and also cement.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    Tools You Need to Install a New Bathtub

    Hopefully you enjoyed our excerpt on Tools You Need to Install a New Bathtub . Thanks a lot for spending some time to read through our blog post. Feel free to take a moment to promote this entry if you enjoyed reading it. I praise you for your time. Please pay a visit to our website back soon.



    Book 24/7

    Report this page